Serial number | industry category | Items exempted from procedures |
1. Agricultural and sideline food processing industry |
1 | Grain and feed processing; vegetable oil processing; meat and poultry processing; starch, starch sugar; soy products manufacturing; egg processing | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in; small food production and processing workshop |
2 | Sugar, sugar product processing; aquatic product processing | Hand-made; only mixed or packed; small workshop for food production and processing |
2. Food Manufacturing |
3 | Convenience food manufacturing; dairy products manufacturing; condiments and fermented products manufacturing; feed additives and food additives manufacturing; nutritious food, health food, frozen drinks, edible ice and other food manufacturing | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in; small food production and processing workshop |
3. Wine and beverage manufacturing |
4 | Manufacturing of alcoholic beverages and liquors; manufacturing of fruit and vegetable juices and other soft drinks | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in |
5 | Refined tea processing | Handmade; small workshop for food production and processing |
4. Textile industry, textile and clothing, apparel industry |
6 | Textile manufacturing | Only cut, sew, iron or clean the dirt |
7 | Clothing manufacturing | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in |
5. Leather, fur, feathers and their products and footwear industry |
8 | Leather, fur, feather (velvet) products | Only cut, sew or cleaned |
6. Wood processing and wood, bamboo, rattan, palm and grass products industry |
9 | Sawn timber, wood chip processing, wood product manufacturing; wood-based panel manufacturing | Does not involve chemical treatment process and is only handmade or processed by peeling, sawing, cutting (planing), natural air drying and other processes |
10 | Manufacturing of bamboo, rattan, palm and grass products | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in |
7. Paper and Paper Products Industry |
11 | Paper product manufacturing | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in |
8. Printing and recording media reproduction industry |
12 | Printing house; magnetic material products | Use existing buildings and only laser printing |
9. Culture, Education, Industrial Beauty, Sports and Entertainment Products Manufacturing |
13 | Manufacturing of cultural, educational, sports and entertainment products | Only assembled or subpackaged |
14 | Handicraft manufacturing | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in; the production of folk handicrafts |
10. Pharmaceutical Manufacturing |
15 | Manufacturing of sanitary materials and medical supplies | Only assembled or subpackaged |
11. Rubber and plastic products industry |
16 | Plastic products manufacturing | Cut or subpackaged only |
12. Metal products industry |
17 | Metal products processing and manufacturing | Only cut and assembled |
13. General equipment manufacturing |
18 | General equipment manufacturing and maintenance | Assembled only |
14. Special equipment manufacturing industry |
19 | Special equipment manufacturing and maintenance | Assembled only |
15. Computer, Communication and Other Electronic Equipment Manufacturing |
20 | Computer manufacturing; electronic device manufacturing; electronic components and electronic special materials manufacturing | Assembled only |
16. Instrument and Meter Manufacturing |
twenty one | Instrumentation Manufacturing | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in |
17. Comprehensive utilization of waste resources |
twenty two | Processing and recycling of waste resources (including biomass) | Only sorted or broken |
18. Electricity and heat production and supply industry |
twenty three | PV | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in |
twenty four | Heat production and supply engineering | Electric boilerFor boilers using natural gas, only the model and number of boilers will be changed, and the total scale will not increase |
19. Water production and supply industry |
25 | Tap water production and supply engineering | Laying of tap water pipe network,Renewal of facilities and equipment in the existing water plant, improvement of landscape, maintenance and transformation of booster pumping station, renewal and expansion |
26 | Centralized treatment of domestic sewage | Rural decentralized domestic sewage treatment facilities |
27 | Desalination, other water treatment and utilization | Non-edible ice manufacturing |
20. Environmental governance industry |
28 | Desulfurization, denitration, dust removal,VOCsGovernance and other projects | Renovation of pollution control facilities that do not increase the types and discharge of pollutants; repair, maintenance, and renewal of the existing environmental treatment facilities and equipment of the company; the sludge drying renovation of the existing domestic sewage treatment plant |
29 | Repair, maintenance, renewal, upgrade and transformation of existing environmental treatment facilities and equipment of industrial enterprises | Does not involve capacity expansion, process changes, pollutant discharge types and emissions increase, and pollutant discharge location changes |
30 | The company’s existing sludge drying renovation project (based on the company’s need to reduce sludge moisture content) | Does not involve the types of pollutants and the increase in emissions |
21. Public Facilities Management Industry |
31 | Town Domestic Waste Transfer Station | Communities, residential quarters, rural domestic waste transfer stations |
32 | Urban excrement disposal project | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in; biogas digester, septic tank |
33 | Municipal facilities, public fitness facilities | Installation, repair and maintenance of municipal facilities (fire hydrants, water pumps, street lights, etc.), installation and maintenance of outdoor billboards (boxes), guardrails, barrier-free facilities, and public fitness facilities |
34 | Transportation and security facilities | Bus stop, public charging pile,ETCConstruction of non-stop toll collection system, installation and maintenance of traffic signs, monitoring facilities, and security facilities |
35 | Environmental sanitation public facilities | Urban public toilets, domestic garbage collection points, waste bins, fecal sewage front-end treatment facilities |
36 | Rainwater facility | Rainwater utilization facilities construction projects, public rainwater facilities |
37 | Drainage network | Direct access to the user's drainage network |
38 | Residual mud treatment facility | Construct ditch residual mud treatment facilities in urban sewage treatment plants, pumping stations, and drainage facilities maintenance bases |
22. Real Estate |
39 | Real estate development, hotels, hotels, office buildings, standard factory buildings, etc. | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled out; the supporting office buildings and workshops in the existing plant area that do not involve the installation of production equipment; residential buildings are equipped with elevators;service,DecorationSeismic reinforcement; facade renovation; old dilapidated building renovation;Demolition activities; site leveling |
40 | Simple low-risk ordinary plant | Does not involve environmentally sensitive areas, and does not produce, store, or use flammable, explosive, toxic, hazardous or dangerous goods |
23. Professional technical service industry |
41 | animal Hospital | Animal clinics and animal hospitals that do not have the ability to perform thoracic, abdominal, and cranial surgery |
24. Hygiene |
42 | Hospitals, specialized prevention and treatment centers (stations, stations), community medical care, health centers (stations, stations), blood stations, emergency centers, maternal and child health centers, nursing homes and other health institutions | Utilize existing buildings of Chinese medicine clinics, community health service centers (stations), maternal and child care centers, pharmacies, physical examination centers, and epidemic prevention stations |
25. Social Undertakings and Service Industries |
43 | Schools, kindergartens, nurseries, welfare homes, nursing homes | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in |
44 | Wholesale and retail markets | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in |
45 | Dining, entertainment, bathing places | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in |
46 | Centralized washing of clothes in hotels, restaurants and medical institutions, centralized washing and disinfection of tableware | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in |
47 | laundry | Using existing buildings |
48 | Golf courses, ski resorts, hunting grounds, racing fields, racetracks, shooting ranges, water sports centers | Not involving environmentally sensitive areas; sports venue maintenance |
49 | Exhibition halls, museums, art galleries, theaters, concert halls, cultural centers, libraries, archives, memorials, stadiums, stadiums, etc. | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in |
50 | Park (including zoo, botanical garden, theme park) | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled; community parks, wetland parks, water parks; landscaping projects, lighting projects |
51 | Driver training base, public transportation hub, large parking lot, motor vehicle testing field | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled; medium and small parking lots; bus stations; public bicycle parking spots; mechanical and simple self-propelled three-dimensional parking equipment |
52 | Gas station | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled out; charging piles; underground oil tank anti-seepage renovation projects of gas stations;Installation of oil and gas recovery devices in gas stations and gas stations |
53 | Car wash | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in |
54 | Car and motorcycle maintenance places | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in |
55 | Funeral home, cemetery, cemetery | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in,Non-profit ashes storage facility |
56 | Purchase of equipment, facilities, installations, software systems, scientific research design, software development, and office information system development and construction | 1.Does not contain radioactive isotopes and radiation devices 2.Does not involve new buildings, production and other links |
57 | Resident service facilities | Gym, chess and card room, tea room, barber shop, beauty shop, massage shop, book shop, flower shop, photography shop, clothing shop, grocery shop, audio and video shop, lottery shop, sewing shop, copy typing shop, shoe shine shop, Retail grocery stores, Internet cafes, game console rooms, waste recycling stations, individual household appliances repair places, bicycles and other non-motorized vehicle repair places |
58 | Hydrophilic platform construction | Hydrophilic platform construction |
26. Water conservancy |
59 | Flood Control Project | Embankment reinforcement; super embankment, multi-level embankment; slope protection of small ditches; reservoir reinforcement |
60 | River and lake improvement | Construction of sluices and pumping stations; source control and pollution interception facilities; wetland parks, ecological interception ditch, buffer zone, ecological oxidation pond; improvement of small and medium rivers;Install protective nets; install monitoring and monitoring equipment |
61 | Construction of small water conservancy facilities, repair and maintenance of existing small water conservancy facilities | 1.Small water conservancy facilities refer to "Flood control standard"(GB50201-2014) Defined as the following projects of grades IV and V: flood control and waterlogging control projects,Water supply, irrigation, power generation projects,Navigation projects, reservoirs, sluices, irrigation and drainage pumping stations and diversion hub projects 2.Do not change the storage capacity, water level, flow and other factors of the original project |
62 | River courseLandscape engineering | Does not involve water source protection areas |
27. Agriculture, Forestry, Fishery |
63 | Agricultural reclamation | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in; farmland reconstruction |
64 | Agricultural products base project (including medicinal material base) | Greenhouse crops |
65 | Economic Forest Base Project | Afforestation |
66 | Freshwater aquaculture | Using ponds or fish ponds for freshwater fish farming |
67 | Bred in sea water | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in |
68 | Agriculture and Forestry Greening Project | Forest carbon sinks, forest stand transformation, ecological landscape forest belts and rural greening and beautifying projects, vegetation restoration, wetland restoration projects, three-dimensional greening, public green spaces |
69 | Forest fire prevention infrastructure | Fire-fighting reservoirs, fire-extinguishing channels, lookouts, fire isolation belts, fire lines, fire warning signs, fire checkpoints |
70 | Forestry garden supporting facilities | Greenhouses (agricultural sheds) that do not involve fermentation processes and are used for forestry and garden research, plant cultivation research, and green waste treatment; surrounding walls, retaining walls, pavilions, corridors and other garden supporting facilities in scenic spots |
28. Transportation, Pipeline Transportation and Storage |
71 | city road | Road maintenance, landscape improvement,upgrade,Road improvement, Dazhong Xiu,Disaster preventionCity road branch |
72 | Grade highway | Grade highway maintenance, grade four highway, landscape improvement,Road improvement, Dazhong Xiu,Disaster prevention |
73 | Urban bridges and tunnels | Maintenance, maintenance, reinforcement, major and medium repairs of urban bridges and tunnels;Pedestrian bridge, pedestrian underpass |
74 | Environmental protection facilities for urban roads and grade highways | Install sound insulation screen |
75 | Urban pipe network and pipe gallery construction | 1.6Natural gas pipelines of megapascals and below; laying of sewage pipelines in communities, residential quarters, and rural areas; sewage diversion and transformation of sewage pipelines; urban natural gas pipelines; pipelines and pipesgalleryInspection, maintenance, dredging; reconstruction of sewage pumping station and rainwater pumping station without new land |
76 | Storage (excluding oil storage, gas storage, and coal storage) | According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in |
77 | Wharf repair, maintenance, reinforcement, wind and dust suppression walls | 1.Does not contain dangerous goods terminal 2.not involvingmain bodyChanges in engineering loading and unloading cargo types and throughput 3.Does not involve water conservation areas |
78 | Temporary relocation of pipelines, management houses and temporary buildings for road supporting construction | Temporary relocation of pipelines, management houses and temporary buildings for road supporting construction |
79 | Installation of oil and gas recovery device for wharf and storage equipment, anti-corrosion engineering of storage equipment | The project does not involve new construction or expansion |
80 | Simple warehouse | Simple low-risk warehouse that does not store flammable, explosive, toxic, hazardous or dangerous goods |
29. Nuclear and Radiation |
81 | Transmission and transformation project | 100kVAC transmission and transformation facilities with the following voltage levels; launch into unshielded spaces0.1MHz~300GHz For electromagnetic fields, the equivalent radiation power is less than the "Electromagnetic Field Control Limits" (GB 8702—2014)"table2Equivalent radiated power of exempt facilities (equipment)"Facility (equipment) of the listed value; iron tower (without any facility equipment) |
82 | Wireless communication | Fiber laying |
30. Other |
83 | Reconstruction project | Does not involve new land use, does not increase the types and quantities of pollutants discharged, and basically does not produce ecological environmental impact |
84 | Rural Human Settlement Environment Improvement Project | Does not involve the ecological protection red line and basically does not produce ecological environmental impact; village-level roads; hardened roads in villages and towns |
85 | Poverty Alleviation Construction Project | Does not involve the ecological protection red line and basically has no ecological environmental impact |
86 | "Wanli Bidao", Greenway, Ancient Post Road, Plank Road, Walkway Construction Project | Does not involve the ecological protection red line and basically has no ecological environmental impact |
87 | Geological disaster control project | Geological disaster control project |
88 | New emergency backup generators inside the enterprise | New emergency backup generators inside the enterprise |
89 | Clean energy renovation project | 65Ton/The use of natural gas in boilers under hours does not involve changes in the main production process, production scale and layout, and increased pollutant emissions. |