公众号
“广州生态环境”
微信订阅号
微博
“广州生态环境”
官方微博
粤商通
“广州生态环境”
粤商通
机器人
您所在的位置: 首页 > 专题栏目 > Policies
Notice of Guangzhou Municipal Ecological Environment Bureau on Issuing the List of Construction Projects Exempted from the Procedures of Environmental Impact Assessment (2020 edition)
【 字体:


Sui Huan Gui Zi [2020] NO.10


To Municipal Airport Committee, Ecological Environment Sub-bureau of all districts, Bureau of Administrative Examination and Approval of Guangzhou Development Zone, the Administrative Examination and Approval Bureau of Nansha District:

  In accordance with the requirements of the Circular of the General Office of the Guangdong Provincial People's Government on The Issuance of Guidelines on Deepening the Reform of the Environmental Impact Assessment System in Our Province (Yue Ban Han  [2020] No. 44), and in order to deepen the reform of the environmental impact assessment system and further optimize the business environment, the Bureau has formulated the Directory of Construction Projects Exempted from the Environmental Impact Assessment Procedures in Guangzhou (2020 Edition), which is now published and implemented.

  The department of ecology and environment is responsible for the interpretation of this directory, and timely revision.


  Guangzhou Municipal Ecological Environment Bureau

  July 9, 2020


List of Construction ProjectsExempted from Environmental Impact Assessment Procedures in Guangzhou (2020 Edition)

  1.In order to deepen the reform of the administrative examination and approval system for ecological environmental protection, standardize the environmental impact assessment management of construction projects, serve the people's livelihood projects, and promote the development of small and micro enterprises, according to the law of the People's Republic of China on Environmental Impact Assessment Law , the List of Classified Management of the Construction Project Environmental Impact Assessment, and the Notice on the publication of the directory of construction projects exempted from environmental impact assessment procedures in guangdong province (2020 edition) (Yue Huan Han [2020] No. 108), and based on the actual conditions of this city, this directory is formulated.

  2.The construction projects included in this list do not need to go through the procedures of environmental impact assessment within the jurisdiction of Guangzhou city, nor do they need to go through the procedures of completed environmental protection acceptance (including the construction projects that have approved the EIA documents but have not completed environmental protection acceptance at the time of promulgation and implementation of this list).

  3.The construction projects listed in this directory shall abide by the national, provincial and municipal laws and regulations on ecological and environmental protection during the construction or operation, and shall be subject to the supervision and administration of the competent ecological and environmental authorities at all levels. In case of any change or adjustment during construction or operation that does not conform to relevant laws and regulations or this directory, the construction or operation shall be stopped immediately, report to the competent department of ecological environment in a timely manner, and go through procedures in accordance with relevant laws and regulations.

  4.This directory will be effective from July 15, 2020 and be valid for 3 years. The Notice of Guangzhou Municipal Bureau of Ecology and Environment on Printing and Distributing the Directory of Construction Projects not Included in the Management of Environmental Impact Assessment in Guangzhou (Sui Huang Gui Zi [2019] NO. 9) shall be repealed simultaneously.


List of Construction Projects Exempted from Environmental Impact Assessment Procedures in Guangzhou (2020 edition)

Serial number

industry category

Items exempted from procedures

1. Agricultural and sideline food processing industry

1

Grain and feed processing; vegetable oil processing; meat and poultry processing; starch, starch sugar; soy products manufacturing; egg processing

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in; small food production and processing workshop

2

Sugar, sugar product processing; aquatic product processing

Hand-made; only mixed or packed; small workshop for food production and processing

2. Food Manufacturing

3

Convenience food manufacturing; dairy products manufacturing; condiments and fermented products manufacturing; feed additives and food additives manufacturing; nutritious food, health food, frozen drinks, edible ice and other food manufacturing

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in; small food production and processing workshop

3. Wine and beverage manufacturing

4

Manufacturing of alcoholic beverages and liquors; manufacturing of fruit and vegetable juices and other soft drinks

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in

5

Refined tea processing

Handmade; small workshop for food production and processing

4. Textile industry, textile and clothing, apparel industry

6

Textile manufacturing

Only cut, sew, iron or clean the dirt

7

Clothing manufacturing

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in

5. Leather, fur, feathers and their products and footwear industry

8

Leather, fur, feather (velvet) products

Only cut, sew or cleaned

6. Wood processing and wood, bamboo, rattan, palm and grass products industry

9

Sawn timber, wood chip processing, wood product manufacturing; wood-based panel manufacturing

Does not involve chemical treatment process and is only handmade or processed by peeling, sawing, cutting (planing), natural air drying and other processes

10

Manufacturing of bamboo, rattan, palm and grass products

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in

7. Paper and Paper Products Industry

11

Paper product manufacturing

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in

8. Printing and recording media reproduction industry

12

Printing house; magnetic material products

Use existing buildings and only laser printing

9. Culture, Education, Industrial Beauty, Sports and Entertainment Products Manufacturing

13

Manufacturing of cultural, educational, sports and entertainment products

Only assembled or subpackaged

14

Handicraft manufacturing

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in; the production of folk handicrafts

10. Pharmaceutical Manufacturing

15

Manufacturing of sanitary materials and medical supplies

Only assembled or subpackaged

11. Rubber and plastic products industry

16

Plastic products manufacturing

Cut or subpackaged only

12. Metal products industry

17

Metal products processing and manufacturing

Only cut and assembled

13. General equipment manufacturing

18

General equipment manufacturing and maintenance

Assembled only

14. Special equipment manufacturing industry

19

Special equipment manufacturing and maintenance

Assembled only

15. Computer, Communication and Other Electronic Equipment Manufacturing

20

Computer manufacturing; electronic device manufacturing; electronic components and electronic special materials manufacturing

Assembled only

16. Instrument and Meter Manufacturing

twenty one

Instrumentation Manufacturing

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in

17. Comprehensive utilization of waste resources

twenty two

Processing and recycling of waste resources (including biomass)

Only sorted or broken

18. Electricity and heat production and supply industry

twenty three

PV

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in

twenty four

Heat production and supply engineering

Electric boilerFor boilers using natural gas, only the model and number of boilers will be changed, and the total scale will not increase

19. Water production and supply industry

25

Tap water production and supply engineering

Laying of tap water pipe network,Renewal of facilities and equipment in the existing water plant, improvement of landscape, maintenance and transformation of booster pumping station, renewal and expansion

26

Centralized treatment of domestic sewage

Rural decentralized domestic sewage treatment facilities

27

Desalination, other water treatment and utilization

Non-edible ice manufacturing

20. Environmental governance industry

28

Desulfurization, denitration, dust removal,VOCsGovernance and other projects

Renovation of pollution control facilities that do not increase the types and discharge of pollutants; repair, maintenance, and renewal of the existing environmental treatment facilities and equipment of the company; the sludge drying renovation of the existing domestic sewage treatment plant

29

Repair, maintenance, renewal, upgrade and transformation of existing environmental treatment facilities and equipment of industrial enterprises

Does not involve capacity expansion, process changes, pollutant discharge types and emissions increase, and pollutant discharge location changes

30

The company’s existing sludge drying renovation project (based on the company’s need to reduce sludge moisture content)

Does not involve the types of pollutants and the increase in emissions

21. Public Facilities Management Industry

31

Town Domestic Waste Transfer Station

Communities, residential quarters, rural domestic waste transfer stations

32

Urban excrement disposal project

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in; biogas digester, septic tank

33

Municipal facilities, public fitness facilities

Installation, repair and maintenance of municipal facilities (fire hydrants, water pumps, street lights, etc.), installation and maintenance of outdoor billboards (boxes), guardrails, barrier-free facilities, and public fitness facilities

34

Transportation and security facilities

Bus stop, public charging pile,ETCConstruction of non-stop toll collection system, installation and maintenance of traffic signs, monitoring facilities, and security facilities

35

Environmental sanitation public facilities

Urban public toilets, domestic garbage collection points, waste bins, fecal sewage front-end treatment facilities

36

Rainwater facility

Rainwater utilization facilities construction projects, public rainwater facilities

37

Drainage network

Direct access to the user's drainage network

38

Residual mud treatment facility

Construct ditch residual mud treatment facilities in urban sewage treatment plants, pumping stations, and drainage facilities maintenance bases

22. Real Estate

39

Real estate development, hotels, hotels, office buildings, standard factory buildings, etc.

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled out; the supporting office buildings and workshops in the existing plant area that do not involve the installation of production equipment; residential buildings are equipped with elevators;service,DecorationSeismic reinforcement; facade renovation; old dilapidated building renovation;Demolition activities; site leveling

40

Simple low-risk ordinary plant

Does not involve environmentally sensitive areas, and does not produce, store, or use flammable, explosive, toxic, hazardous or dangerous goods

23. Professional technical service industry

41

animal Hospital

Animal clinics and animal hospitals that do not have the ability to perform thoracic, abdominal, and cranial surgery

24. Hygiene

42

Hospitals, specialized prevention and treatment centers (stations, stations), community medical care, health centers (stations, stations), blood stations, emergency centers, maternal and child health centers, nursing homes and other health institutions

Utilize existing buildings of Chinese medicine clinics, community health service centers (stations), maternal and child care centers, pharmacies, physical examination centers, and epidemic prevention stations

25. Social Undertakings and Service Industries

43

Schools, kindergartens, nurseries, welfare homes, nursing homes

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in

44

Wholesale and retail markets

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in

45

Dining, entertainment, bathing places

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in

46

Centralized washing of clothes in hotels, restaurants and medical institutions, centralized washing and disinfection of tableware

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in

47

laundry

Using existing buildings

48

Golf courses, ski resorts, hunting grounds, racing fields, racetracks, shooting ranges, water sports centers

Not involving environmentally sensitive areas; sports venue maintenance

49

Exhibition halls, museums, art galleries, theaters, concert halls, cultural centers, libraries, archives, memorials, stadiums, stadiums, etc.

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in

50

Park (including zoo, botanical garden, theme park)

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled; community parks, wetland parks, water parks; landscaping projects, lighting projects

51

Driver training base, public transportation hub, large parking lot, motor vehicle testing field

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled; medium and small parking lots; bus stations; public bicycle parking spots; mechanical and simple self-propelled three-dimensional parking equipment

52

Gas station

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled out; charging piles; underground oil tank anti-seepage renovation projects of gas stations;Installation of oil and gas recovery devices in gas stations and gas stations

53

Car wash

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in

54

Car and motorcycle maintenance places

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in

55

Funeral home, cemetery, cemetery

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in,Non-profit ashes storage facility

56

Purchase of equipment, facilities, installations, software systems, scientific research design, software development, and office information system development and construction

1.Does not contain radioactive isotopes and radiation devices

2.Does not involve new buildings, production and other links

57

Resident service facilities

Gym, chess and card room, tea room, barber shop, beauty shop, massage shop, book shop, flower shop, photography shop, clothing shop, grocery shop, audio and video shop, lottery shop, sewing shop, copy typing shop, shoe shine shop, Retail grocery stores, Internet cafes, game console rooms, waste recycling stations, individual household appliances repair places, bicycles and other non-motorized vehicle repair places

58

Hydrophilic platform construction

Hydrophilic platform construction

26. Water conservancy

59

Flood Control Project

Embankment reinforcement; super embankment, multi-level embankment; slope protection of small ditches; reservoir reinforcement

60

River and lake improvement

Construction of sluices and pumping stations; source control and pollution interception facilities; wetland parks, ecological interception ditch, buffer zone, ecological oxidation pond; improvement of small and medium rivers;Install protective nets; install monitoring and monitoring equipment

61

Construction of small water conservancy facilities, repair and maintenance of existing small water conservancy facilities

1.Small water conservancy facilities refer to "Flood control standard"(GB50201-2014) Defined as the following projects of grades IV and V: flood control and waterlogging control projects,Water supply, irrigation, power generation projects,Navigation projects, reservoirs, sluices, irrigation and drainage pumping stations and diversion hub projects

2.Do not change the storage capacity, water level, flow and other factors of the original project

62

River courseLandscape engineering

Does not involve water source protection areas

27. Agriculture, Forestry, Fishery

63

Agricultural reclamation

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in; farmland reconstruction

64

Agricultural products base project (including medicinal material base)

Greenhouse crops

65

Economic Forest Base Project

Afforestation

66

Freshwater aquaculture

Using ponds or fish ponds for freshwater fish farming

67

Bred in sea water

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in

68

Agriculture and Forestry Greening Project

Forest carbon sinks, forest stand transformation, ecological landscape forest belts and rural greening and beautifying projects, vegetation restoration, wetland restoration projects, three-dimensional greening, public green spaces

69

Forest fire prevention infrastructure

Fire-fighting reservoirs, fire-extinguishing channels, lookouts, fire isolation belts, fire lines, fire warning signs, fire checkpoints

70

Forestry garden supporting facilities

Greenhouses (agricultural sheds) that do not involve fermentation processes and are used for forestry and garden research, plant cultivation research, and green waste treatment; surrounding walls, retaining walls, pavilions, corridors and other garden supporting facilities in scenic spots

28. Transportation, Pipeline Transportation and Storage

71

city road

Road maintenance, landscape improvement,upgrade,Road improvement, Dazhong Xiu,Disaster preventionCity road branch

72

Grade highway

Grade highway maintenance, grade four highway, landscape improvement,Road improvement, Dazhong Xiu,Disaster prevention

73

Urban bridges and tunnels

Maintenance, maintenance, reinforcement, major and medium repairs of urban bridges and tunnels;Pedestrian bridge, pedestrian underpass

74

Environmental protection facilities for urban roads and grade highways

Install sound insulation screen

75

Urban pipe network and pipe gallery construction

1.6Natural gas pipelines of megapascals and below; laying of sewage pipelines in communities, residential quarters, and rural areas; sewage diversion and transformation of sewage pipelines; urban natural gas pipelines; pipelines and pipesgalleryInspection, maintenance, dredging; reconstruction of sewage pumping station and rainwater pumping station without new land

76

Storage (excluding oil storage, gas storage, and coal storage)

According to the "Construction Project Environmental Impact Assessment Classification Management List", the environmental impact registration form should be filled in

77

Wharf repair, maintenance, reinforcement, wind and dust suppression walls

1.Does not contain dangerous goods terminal

2.not involvingmain bodyChanges in engineering loading and unloading cargo types and throughput

3.Does not involve water conservation areas

78

Temporary relocation of pipelines, management houses and temporary buildings for road supporting construction

Temporary relocation of pipelines, management houses and temporary buildings for road supporting construction

79

Installation of oil and gas recovery device for wharf and storage equipment, anti-corrosion engineering of storage equipment

The project does not involve new construction or expansion

80

Simple warehouse

Simple low-risk warehouse that does not store flammable, explosive, toxic, hazardous or dangerous goods

29. Nuclear and Radiation

81

Transmission and transformation project

100kVAC transmission and transformation facilities with the following voltage levels; launch into unshielded spaces0.1MHz~300GHz For electromagnetic fields, the equivalent radiation power is less than the "Electromagnetic Field Control Limits" (GB 8702—2014)"table2Equivalent radiated power of exempt facilities (equipment)"Facility (equipment) of the listed value; iron tower (without any facility equipment)

82

Wireless communication

Fiber laying

30. Other

83

Reconstruction project

Does not involve new land use, does not increase the types and quantities of pollutants discharged, and basically does not produce ecological environmental impact

84

Rural Human Settlement Environment Improvement Project

Does not involve the ecological protection red line and basically does not produce ecological environmental impact; village-level roads; hardened roads in villages and towns

85

Poverty Alleviation Construction Project

Does not involve the ecological protection red line and basically has no ecological environmental impact

86

"Wanli Bidao", Greenway, Ancient Post Road, Plank Road, Walkway Construction Project

Does not involve the ecological protection red line and basically has no ecological environmental impact

87

Geological disaster control project

Geological disaster control project

88

New emergency backup generators inside the enterprise

New emergency backup generators inside the enterprise

89

Clean energy renovation project

65Ton/The use of natural gas in boilers under hours does not involve changes in the main production process, production scale and layout, and increased pollutant emissions.

  Note: The "environmental sensitive areas" in each column of this directory means the environmental sensitive areas in the corresponding column of theEnvironmental Impact Assessment Classification management Directory of Construction Projects (Order No. 44 of the Ministry of Environmental Protection).


  Disclosure: Active disclosure


分享到:
微信 扫一扫